A practical guide to power rating, load profile, duty type, voltage, frequency, installation and quotation preparation.
Start with the electrical load
List the equipment that will be powered and identify starting loads, motor loads and sensitive equipment. A load assessment by a qualified electrical professional is recommended before selecting a generator.
Separate prime and standby requirements
A generator used as a continuous or prime source may require a different rating and operating plan from a standby unit used during utility outages. Explain the expected operating hours and load pattern to the supplier.
Confirm electrical parameters
Confirm rated voltage, frequency, phase, power factor, altitude, ambient temperature and applicable local standards. These details affect selection and configuration.
Consider the installation environment
Decide whether the installation needs an open frame, acoustic enclosure, trailer chassis or container. Consider ventilation, exhaust routing, access for maintenance, weather exposure and noise requirements.
Prepare information for a quotation
For a useful quotation, provide required kVA or kW, application, quantity, destination country, voltage/frequency, preferred engine brand and any control or enclosure options.
Tell Us About Your Power Requirement
Share your required capacity, application, configuration and destination country. Our team can review the information for a suitable quotation.
Request a Quote